Home > ADA-Compliant Sensor Faucets—Innovation that Includes Everyone
ADA-Compliant Sensor Faucets—Innovation that Includes Everyone
ADA Compliant · Sensor Ready · Contractor Friendly

ADA-Compliant Sensor Faucets—Innovation that Includes Everyone

Sensor faucets and automatic soap systems that help teams support accessibility goals without adding installation friction. Built for airports, hospitals, universities, stadiums, and government facilities where predictable activation, service access, and controlled water use matter.

ToF and IR sensor options AC and DC power paths Low flow configurations Soap dispenser integration Submittals and install docs
Spec-grade touchless faucet installation in a modern commercial restroom
Contractor note: Confirm rough-in depth, control box access, and power routing early. It prevents rework during trim-out.

ADA performance without adding complexity

In commercial restrooms, accessibility is not only about fixture placement. It is about consistent user experience. A sensor faucet can reduce grip and wrist demands, simplify interaction, and help keep the basin zone cleaner. For project teams, the goal is a spec that installs cleanly, services fast, and holds up under heavy use.

Predictable activation

Stable sensing reduces nuisance triggers and helps users understand what to expect at the basin.

Service access planning

Confirm where modules live and how techs will access them without removing finished surfaces.

Water and lifecycle goals

Timed shutoff and low flow options help reduce consumption without forcing awkward user behavior.

Engineer and contractor checklist

Use this list during design assist, submittals, and rough-in coordination. It helps avoid the common surprises that slow down trim-out and commissioning.

Power path

Confirm AC, battery, or hybrid strategy and where transformers or battery boxes will be serviced.

Hydraulics and mixing

Coordinate pressure ranges, tempering strategy, and hot and cold mixing method before final trim selection.

Sensor behavior

Account for glossy basins, sunlight, and mirror proximity that can affect sensing.

Maintenance access

Require access panels or service clearances so solenoids, filters, and modules can be replaced fast.

Spec set examples with matching links

These are clean starting points for schedules, coordination, and submittals. Each card opens on FontanaShowers.

Browse all touchless

Build a compare set

Select up to 3 cards and click Compare. This helps teams align power, mounting approach, and coordination needs.

Jump to docs

If you are in submittals, open the BIM library and installation guidance without scrolling.

Touchless faucet close-up for commercial specification

FS18128 Faucet and soap set

Unified set for coordinated installs and consistent service planning.

Open product
Touchless installation photo used as a spec-grade visual

FS9859G deck soap dispenser

Deck mounted option for commercial basins and coordinated countertop layouts.

Open product Install notes
Spec-grade program hub showing trade-ready systems for coordination and submittals

Spec-grade program hub

Trade-ready faucet, dispenser, and shower systems with support for submittals and coordination.

Open hub
Fast spec tip: pick the faucet family first, then select the soap delivery method and refill strategy. It reduces late stage changes when the finish schedule is already locked.

Video for installation and field coordination

One full walkthrough plus a silent looping clip you can reuse on pages and in submittal workflows.

Short clip for coordination

A silent loop that shows the spec grade restroom context. Useful for quick reviews and field teams.

If you do not have an MP4 yet, keep the clip block and swap the src later. The poster image will still display cleanly.

Submittals, BIM, and field documents

Keep documentation aligned to the selected finish and power option. That is the easiest way to avoid mismatched accessories, wrong transformers, or service access problems after walls are closed.

Compare set
Use these spec set examples to speed up schedules and avoid late field changes. Confirm power path, mixing strategy, and service access during rough in, then pull matching BIM files and installation notes for submittals and commissioning.