Certifications & Compliance
Built on standards. Ready for submittals.
A clear, project-friendly overview of the codes, listings, and documentation paths used to evaluate FontanaShowers products by SKU, region, and project requirement.
UL
Electrical Safety
For sensor faucets, control boxes, drivers, transformers, and other powered components where a listing applies.
UPC
IAPMO Listings
Supports plumbing certification review for products aligned to UPC, IPC, and related testing pathways.
EPA
WaterSense
Helps teams evaluate water efficiency targets for faucets and showering systems without losing performance.
ADA
Accessibility
Guides reach ranges, clearances, controls, sensor placement, and user-friendly fixture planning.
ASME
Performance
Covers fitting and fixture requirements such as flow, durability, mechanical performance, and materials.
ASTM
Materials
References material grades, finish durability, corrosion resistance, and project-specific testing standards.
ICC
Code Alignment
Connects selections to IPC model code requirements, local amendments, and AHJ expectations.
ISO
Quality Systems
Applies to manufacturing quality management scope, certificate status, and facility-level validation.
Specifier Guide
Confirm the code path
Identify whether UPC, IPC, local amendments, or international equivalents govern the project.
Match the exact SKU
Check model, finish, flow rate, power supply, accessories, and installation configuration before relying on a mark.
Build the submittal matrix
Combine listings, test standards, accessibility notes, water targets, and electrical coordination in one table.
Coordinate with the AHJ
Use official directories and current documents to answer review comments quickly and cleanly.
Documentation
Cut sheets, installation guides, flow configurations, lab reports, declarations, and listing references when available.
Environmental Goals
WaterSense-aligned selections and LEED water-efficiency conversations for commercial and institutional projects.
Human-Centered Design
Touchless operation, intuitive sensor locations, reachable controls, and accessibility planning support.
Compliance Support
Need SKU-level verification?
Send the model numbers, project location, and target code pathway. The team can help gather the right documents for your submittal package.
Start RFQ
|
|
|