Home > Automatic Faucet Set | BIM / MEP Coordination Drawing

Fontana BIM / MEP Coordination™ | Architectural and Engineering Resource

Fontana Combination Faucet & Soap Dispenser: BIM / MEP Coordination Drawing

This BIM / MEP coordination resource is intended to support architects, plumbing engineers, electrical engineers, BIM coordinators, contractors and installers integrating the Fontana automatic countertop faucet and touchless soap dispenser into coordinated construction documents. The drawing identifies plumbing connections, electrical routing, equipment tags, mounting elevations, service zones, cable management requirements and coordination notes needed to reduce conflicts between architectural, plumbing, electrical and cabinetry systems.

Fontana Automatic Faucet and Soap Dispenser BIM / MEP Coordination System

This coordinated fixture arrangement combines automatic water delivery and touchless soap dispensing with concealed plumbing, power and control components. The drawing supports multidisciplinary model development, rough-in verification, equipment tagging, accessible installation and long-term service planning beneath the countertop.

  • Fixture configuration: Countertop automatic faucet and touchless soap dispenser
  • Coordination scope: Plumbing, electrical, mounting, service and accessibility
  • Faucet supply: 1/2-inch compression
  • Soap-dispenser supply tube: 1/4-inch OD
  • Drain connection: 1-1/4-inch OD
  • AC power: 100–240 VAC, 50/60 Hz
  • Controller / power module: IPX4 minimum
  • Maximum countertop thickness: 50 mm (2 in.)
  • Maximum faucet outlet height: 1016 mm (40 in.) AFF
  • Maximum dispenser outlet height: 1000 mm (39 in.) AFF
  • Minimum knee clearance: 864 mm (34 in.)
  • Recommended service zone: 760 × 609 × 560 mm (30 × 24 × 22 in.)

Required BIM / MEP Coordination Drawing Package

Each drawing should use a consistent equipment-tagging convention, centerline reference and service-zone notation. The package should clearly identify plumbing connections, AC and low-voltage routing, controller locations, mounting heights, accessibility clearances, cabinet service envelopes and cable-management requirements. All trade interfaces should be verified before rough-in and fabrication.

Plumbing Connection Coordination

Shows faucet supply, soap-dispenser tubing, mixing valve, shut-off valves, P-trap, check valve and drain connection. Provide accessible isolation valves and coordinate all rough-in locations with the plumbing plan.

Electrical Routing & Power

Illustrates AC power, controller/power module, quick-connect sensor wiring, soap-dispenser cable and optional mixing-valve power. Use GFCI protection where required and keep all electrical components accessible for service.

Equipment IDs & BIM Tagging

Uses coordinated equipment IDs such as FA-01, SD-01, CTRL-01, MV-01, SV-01, SV-02, PW-01 and D-01 to simplify architectural, plumbing, electrical and BIM documentation.

Mounting Elevations

Shows faucet and soap-dispenser outlet elevations above finished floor, countertop thickness and required knee clearance. Final elevations should be coordinated with accessibility criteria and basin geometry.

Service Zones & Access Clearances

Defines a recommended under-counter service envelope of approximately 760 mm wide, 609 mm deep and 560 mm high for plumbing, electrical and control components.

Cable Management

Shows AC and low-voltage/data cables secured to cabinet surfaces, kept clear of moving parts and hot-water lines, and provided with drip loops. Do not route cables through water-supply or drain penetrations.

Accessibility Coordination

Coordinates outlet heights, knee clearance and user approach with the applicable ADA, ICC/ANSI and project-specific accessibility requirements.

Trade Coordination

Align plumbing, electrical, cabinetry, countertop and architectural work so rough-ins, penetrations, service clearances and component mounting do not conflict during construction.

Final Rough-In Verification

Confirms all equipment tags, power locations, supply connections, drain positions, mounting elevations and service zones before installation and commissioning.

Engineering note: The BIM / MEP coordination drawing is a reference document and should not be scaled. Verify all rough-in locations, equipment IDs, mounting elevations, power requirements, plumbing connections, service zones and accessibility dimensions against approved architectural and MEP drawings, project submittals and manufacturer installation instructions before construction.

BIM, MEP and Installation Coordination Considerations

Plumbing Rough-In

Coordinate water supplies, drain location, valves and optional mixing components before cabinet and countertop fabrication.

Electrical Power

Provide appropriately protected AC power and maintain access to the controller, power supply and low-voltage quick-connect cables.

Equipment Tagging

Use consistent tags across architectural, plumbing, electrical and BIM models so every component can be traced between disciplines.

Service Access

Maintain clear front and side access for all serviceable plumbing and electrical components beneath the countertop.

Cable Separation

Keep AC and low-voltage/data cables organized, protected from moisture and separated from hot-water lines and moving hardware.

Accessibility Review

Verify final fixture elevations, knee space and reach conditions against the project accessibility requirements before installation.

Professional Engineering and Accessibility References

Project verification: BIM / MEP coordination drawings are multidisciplinary coordination tools and do not replace approved construction documents or project submittals. The architect, plumbing engineer, electrical engineer, BIM coordinator, contractor and qualified installer should verify equipment tags, rough-in locations, power requirements, plumbing connections, mounting elevations, service clearances, accessibility criteria and locally adopted codes before fabrication, installation and commissioning.