Home > Fontana MotionWave™ Line - Gold | Wall Opening & Finished-Surface Clearance

Fontana Touchless Faucets™ | Architectural and Engineering Resource

Fontana MotionWave™ Line Brushed Gold Touchless Bathroom Faucet: Wall Opening & Finished-Surface Clearance

This wall-opening and finished-surface-clearance resource supports architects, plumbing engineers, interior designers, contractors and installers coordinating the Fontana MotionWave™ Line FS7035BG wall-mounted touchless bathroom faucet. The detail identifies the required wall penetration, finished-surface reference, concealed connection clearance, trim interface and coordination zone needed for correct installation.

Fontana MotionWave™ Line FS7035BG Touchless Bathroom Faucet

The FS7035BG is a Brushed Gold wall-mounted touchless bathroom faucet designed for concealed installation within a coordinated finished-wall assembly.

  • Model: FS7035BG
  • Product type: Touchless bathroom faucet
  • Installation: Wall mounted
  • Material: Lead-Free Brass
  • Finish: Brushed Gold
  • Valve included: Yes
  • Valve type: Ceramic Valve
  • Water connection: 1/2-inch NPT
  • Flow rate: 1.2 GPM / 4.5 LPM
  • Spout reach: 6.93 inches
  • Installation type: Concealed wall installation
  • Application: Commercial and architectural washrooms

Wall Opening & Surface Clearance Scope

The detail should show the coordinated opening through the finished-wall assembly and the clearances required around the concealed faucet connection. Reference the final finished-surface plane, wall penetration, trim coverage, supporting substrate and surrounding construction. Only verified manufacturer dimensions should be used in final construction documents.

Complete Wall Opening Detail

Show the finished wall, coordinated penetration, concealed connection, trim coverage and surrounding construction in one enlarged detail.

Finished-Surface Plane

Use the final tile, stone or other architectural finish as the reference plane for exposed trim and concealed connection depth.

Wall Opening

Show the required penetration through the wall assembly while avoiding an unnecessarily oversized opening around the faucet connection.

Opening Centerline

Align the wall penetration with the concealed connection and exposed faucet centerline.

Finish Thickness

Coordinate the complete build-up of substrate, waterproofing, adhesive and final finish material when setting the installation depth.

Substrate Clearance

Maintain sufficient clearance around the concealed connection so backer materials do not interfere with assembly or service.

Trim Coverage

Show the Brushed Gold trim extending sufficiently beyond the wall opening to provide a clean finished interface.

Trim Seating Surface

Provide a flat and continuous finished surface so the trim seats evenly without rocking or visible gaps.

Connection Clearance

Maintain adequate space around the concealed plumbing connection for installation, tightening and inspection.

Thread Access

Keep the connection zone clear enough to permit proper thread engagement without interference from finish materials.

Wall Sleeve Clearance

Where a sleeve is used, coordinate its diameter and position so it does not prevent final trim installation.

Structural Blocking Clearance

Locate supporting blocking so it provides secure mounting without restricting the required wall penetration.

Waterproofing Clearance

Integrate the penetration with the wall waterproofing system while maintaining the required opening for the faucet connection.

Sealant Joint

Provide a compatible perimeter seal where required between exposed trim and the finished architectural surface.

Tile Edge Clearance

Avoid placing cut tile or stone edges where they may interfere with the trim seating area or concealed connection.

Stone Finish Clearance

Coordinate thicker stone finishes so the concealed connection remains within its approved installation range.

Backer Board Opening

Keep the substrate opening aligned with the finished-wall penetration and faucet centerline.

Membrane Penetration

Coordinate penetrations through waterproofing membranes to maintain continuity around the fixture connection.

Wall Cavity Clearance

Maintain adequate internal clearance between the concealed connection and adjacent framing or building services.

Service Clearance

Provide sufficient access around serviceable concealed components for inspection and future maintenance.

Spout Opening Alignment

Position the wall opening so the exposed spout remains level and perpendicular to the finished surface.

Sensor Opening Alignment

Coordinate any required sensor penetration with the faucet assembly and intended detection field.

Edge Protection

Protect wiring, plumbing and fixture components from sharp edges at metal framing or finish penetrations.

Finished Opening

Show the completed opening fully concealed by the installed trim with no unnecessary exposed gaps.

Engineering note: Wall-opening dimensions must not be based on estimated product measurements. Confirm the required opening, finished-wall thickness, trim coverage, connection depth and mounting clearances from the approved FontanaShowers specification sheet or project submittal before wall fabrication.

Required Wall Opening Views

Front Opening Elevation

Show the opening centerline, penetration limits and trim coverage relative to the finished wall.

Side Wall Section

Show framing, substrate, waterproofing, finish thickness and concealed connection depth.

Trim Coverage Detail

Show the relationship between the finished opening and exposed Brushed Gold trim.

Connection Clearance Detail

Show the clear space required around the plumbing connection for installation and inspection.

Waterproofing Detail

Show how the fixture penetration interfaces with the project waterproofing system.

Substrate Opening Detail

Show the backer-board opening and its alignment with the final finish opening.

Structural Clearance View

Show the relationship between framing, blocking and the required fixture penetration.

Finished Installation

Show the completed trim fully covering the coordinated wall opening.

Recommended Wall Opening Sequence

1. Review Approved Submittals

Confirm the final faucet configuration, wall penetration requirements and installation depth.

2. Confirm Wall Build-Up

Establish the combined thickness of substrate, waterproofing, adhesive and finish material.

3. Establish Centerlines

Transfer the approved faucet and connection centerlines to the wall assembly.

4. Coordinate Blocking

Install structural backing without obstructing the required fixture opening or connection zone.

5. Prepare Substrate Opening

Create the required opening in the backer material while maintaining alignment with the concealed connection.

6. Coordinate Waterproofing

Integrate the penetration with the selected waterproofing system before final finish installation.

7. Install Finish Material

Cut tile, stone or other finish accurately around the coordinated fixture opening.

8. Verify Opening Clearance

Check that the completed penetration does not interfere with connection threads or installation hardware.

9. Test Trim Coverage

Dry-fit the trim and confirm it fully covers the finished opening while seating flat against the surface.

10. Install Faucet Components

Complete the exposed faucet installation without damaging the finished wall edges.

11. Seal Wall Interface

Apply compatible perimeter sealing where required around the trim and finish interface.

12. Final Inspection

Verify trim seating, opening coverage, alignment and absence of exposed gaps before project completion.

Architectural and MEP Coordination

Finish Coordination

Coordinate wall openings with final tile, stone or other architectural finish dimensions.

Structural Coordination

Keep framing and backing clear of the required penetration while maintaining suitable fixture support.

Plumbing Coordination

Ensure plumbing fittings and threaded connections remain accessible through the coordinated wall opening.

Waterproofing Coordination

Integrate the fixture penetration into the wall moisture-control system without obstructing final trim installation.

Electrical Coordination

Protect sensor and control wiring where it passes through or adjacent to wall openings.

Millwork Coordination

Where adjacent casework is present, ensure it does not restrict access to concealed fixture connections.

Trim Coordination

Maintain sufficient uninterrupted finished surface around the opening for proper trim seating and coverage.

Maintenance Coordination

Provide reasonable future access to concealed connections without unnecessary damage to permanent finishes.

Wall Opening Component Identification

  • Finished surface: Final tile, stone or architectural wall finish defining the visible installation plane.
  • Wall substrate: Backing material supporting the final architectural finish.
  • Waterproofing membrane: Moisture-control layer surrounding the fixture penetration.
  • Wall opening: Coordinated penetration allowing the concealed faucet connection to pass through the wall assembly.
  • Structural blocking: Rigid backing supporting the concealed and exposed faucet components.
  • Concealed connection: Internal faucet or plumbing connection positioned behind the finished wall.
  • Brushed Gold trim: Visible finish component covering the coordinated wall opening.
  • Perimeter seal: Compatible sealant used around the finished fixture interface where required.
  • Clearance zone: Space surrounding the connection required for installation, inspection and service.
  • Service opening: Access provision used where concealed components require future maintenance.

Professional Engineering and Accessibility References

Project verification: This wall opening and finished-surface clearance resource is intended for coordination and does not replace an approved project submittal. The architect, plumbing engineer, wall-system designer, tile or stone installer and licensed installer should verify final wall thickness, required opening size, connection depth, trim coverage, waterproofing, structural support and locally adopted codes before fabrication or installation.