Fontana Commercial Brushed Gold Touchless Automatic Sensor Faucet: BIM / MEP Coordination

This coordination resource supports architects, plumbing engineers, electrical designers, BIM coordinators, contractors and facility managers integrating the FS1099 into a commercial lavatory assembly. The coordinated model should identify the faucet, basin, deck penetration, water supply, sensor controls and selected power arrangement. Include installation interfaces and service space alongside the visible fixture geometry.

Fontana FS1099 Coordinated Fixture and Services Assembly

Coordinate the visible faucet with its under-counter equipment and project connections. Validate model geometry and parameters against the approved submittal, identifying provisional information where dimensions or equipment details remain unresolved. Confirm the availability and suitability of any model-specific BIM file before project use.

  • Model: FS1099
  • Finish: Brushed Gold
  • Installation: Single-hole deck mount
  • Overall height: 6 inches / 152.4 mm
  • Base dimension shown: 1.5 inches / 38.1 mm
  • Upper-body dimension shown: 0.5 inch / 12.7 mm
  • Listed inlet / outlet connection: G1/2 inch
  • Published flow rate: 2 GPM / 7.57 L/min
  • DC power: 6 V — four AA alkaline batteries
  • Listed AC power: 220–240 V, 50/60 Hz
  • Numerical spout reach and outlet height: Not provided in the specification drawing
  • Equipment geometry: Confirm the supplied control-box and accessory configuration
  • Model reference: Approved project submittal and applicable manufacturer documents

Required BIM and MEP Coordination Package

Establish the fixture’s placement reference, equipment boundaries and connection ownership before coordinating services. Use the project’s agreed information requirements to determine modeling detail. Keep confirmed dimensions, schematic representations and maintenance clearances distinguishable in views, schedules and exported coordination files.

Fixture Placement and Datums

Locate the faucet relative to the finished deck and basin centerline. Coordinate countertop elevation and fixture orientation using consistent project datums, avoiding conflicting placement references between disciplines.

Basin and Deck Interface

Coordinate the mounting penetration with the selected basin, countertop thickness and underside supports. Review the opening and fastening arrangement before issuing fabrication information.

Water Supply Connections

Identify the incoming supply, isolation fittings and control-box inlet. Trace the outlet connection to the faucet, and verify the relationship between the listed connection designation and project piping adapters.

Power Configuration

Identify the supplied battery-only or AC/DC arrangement. Coordinate any required electrical provision from approved equipment information, distinguishing the external supply interface from the sensor connection.

Control and Sensor Routing

Locate the control equipment within the usable reach of the supplied hose and sensor cable. Coordinate routing around basin returns, supports and cabinet movement without assigning unsupported cable-extension limits.

Optional Mixing Assembly

Include a mixing device only where selected for the project. Identify its separate hot, cold and mixed-water interfaces, operating requirements and adjustment access using approved device-specific information.

Service and Removal Space

Represent access for isolation, cover removal, battery replacement, connector release and faucet fastening. Check removal paths as well as physical collisions with neighboring components.

Fixture Data and Schedules

Coordinate model identification, finish, selected options and connection information with the fixture schedule. Record document references and unresolved parameters so provisional data is not mistaken for approved information.

Engineering note: A BIM resource link does not establish the availability, accuracy or completeness of a model-specific FS1099 file. Validate any downloaded or project-created model against the approved submittal. Do not derive missing spout reach, outlet height or service dimensions by scaling a photograph. The illustrated body dimensions do not define a complete fabrication model; their millimeter equivalents above are calculated conversions.

BIM and MEP Coordination Sequence

1. Establish Approved Inputs

Identify the selected faucet, basin, control equipment and accessories. Collect the applicable submittals and mark missing dimensions or conflicting information for resolution.

2. Validate the Model

Check units, placement references, orientation and available geometry. Confirm that modeled dimensions and equipment variants match the selected assembly before connecting project services.

3. Coordinate Discipline Interfaces

Assign responsibility for the deck penetration, water supply, electrical provision and optional mixing equipment. Align model parameters and schedules with those agreed interfaces.

4. Review Conflicts and Access

Check the assembly against the basin, structure and cabinetry. Include fastening access, equipment servicing and accessible lavatory clearances in addition to physical collision checks.

5. Resolve Coordination Issues

Assign each issue to a responsible discipline and document its resolution. Update affected views, schedules and fabrication references together when equipment positions or connection arrangements change.

6. Verify the Installed Arrangement

Compare the completed installation with the accepted layout. Record approved field changes and retain component identification, connection locations and maintenance information for handover.

Architectural and MEP Coordination Considerations

Geometry and Information Status

Distinguish approved product geometry from schematic equipment representations. Identify the purpose and limitations of each model element before using it for fabrication or installation.

Hydraulic Design Data

Keep published outlet flow separate from the project’s calculated system demand. Resolve inconsistent pressure entries in the faucet documentation before establishing operating limits in schedules or model parameters.

Electrical Interface Ownership

Confirm the supplied equipment ratings and installation method before assigning an electrical connection. Do not infer a universal input voltage or direct mains connection from a generic model parameter.

Countertop Fabrication Release

Coordinate the mounting location and penetration with the approved basin and hardware. Confirm fabrication dimensions independently of visual alignment in the architectural model.

Accessible Lavatory Assembly

Evaluate approach, faucet access and required knee and toe clearances with the full under-counter arrangement. Include control equipment, supports and piping in the accessibility review.

Asset and Maintenance Information

Retain useful equipment identification, selected options and service references in the handover record. Avoid filling unsupported parameters with estimated values merely to complete the model.

Professional Engineering and Accessibility References

Project verification: This resource supports multidisciplinary coordination and does not constitute an approved BIM model or fabrication drawing. Confirm geometry, connection interfaces, selected equipment, service clearances and information status against approved project documentation before construction.