Fontana Automatic Sensor Faucets™ | Architectural and Engineering Resource
Fontana American Standard Deck-Mounted Sensor Faucet:
Commissioning and Performance Verification
This commissioning and performance verification resource is intended to
support architects, plumbing engineers, commissioning authorities,
contractors, installers, facility managers and maintenance personnel
responsible for verifying the operational readiness of the Fontana
American Standard deck-mounted automatic sensor faucet. The drawing
package identifies the commissioning sequence, water-pressure
verification, sensor activation testing, flow performance, automatic
shutoff, electrical operation, leak inspection, maintenance readiness
and final project acceptance requirements before the fixture is placed
into service.
Fontana American Standard Deck-Mounted Sensor Faucet
Commissioning confirms that the faucet has been installed in
accordance with the approved project documentation and operates
correctly under actual site conditions. Mechanical, electrical and
sensor-controlled functions should all be verified before the
fixture is released for normal use.
This verification procedure is intended to confirm reliable sensor
operation, proper water delivery, automatic shutoff, electrical
performance and maintenance accessibility while documenting the
final acceptance of the installation.
- Model: FS2361TFDP
- Installation: Deck mounted
- Operation: Infrared automatic sensor
- Commissioning: Final project verification
- Inspection: Mechanical and electrical systems
- Performance: Operational testing required
- Acceptance: Final installation approval
Required Commissioning and Performance Verification Package
Each commissioning record should use a consistent verification
checklist, inspection sequence and product-identification block.
Testing should confirm that all plumbing, electrical and automatic
control systems operate as intended before project handover.
Commissioning Overview
Provides the complete commissioning workflow from initial
inspection through final operational acceptance.
Installation Inspection
Verify that the faucet, mounting hardware and concealed
components are installed according to the approved project
documentation.
Water Supply Verification
Confirm that water supply connections, shutoff valves and supply
pressure meet the specified operating requirements.
Leak Inspection
Inspect all plumbing connections, flexible hoses, fittings and
the faucet body for leakage before operational testing begins.
Electrical Verification
Verify the controller, transformer or battery power supply,
cable connections and electrical routing before energizing the
system.
Sensor Activation Test
Confirm that the infrared sensor consistently detects the user's
hands within the intended operating zone.
Solenoid Operation
Verify that the electronic controller correctly opens and closes
the solenoid valve during every activation cycle.
Water Flow Performance
Confirm stable water delivery, consistent stream quality and
proper aerator performance during normal operation.
Automatic Shutoff
Verify that water flow stops promptly after the user's hands
leave the sensor detection zone.
Temperature Verification
Where applicable, confirm that the mixed-water temperature
remains within the project's specified operating range.
Maintenance Accessibility
Verify unobstructed access to the controller, solenoid, shutoff
valves, filters and other serviceable components.
Operational Cycle Test
Perform repeated activation cycles to confirm reliable automatic
operation under normal usage conditions.
Performance Documentation
Document inspection results, commissioning observations,
corrective actions and verification records for project
handover.
Final Acceptance
Confirm that the faucet complies with project specifications and
is approved for routine operation following successful
commissioning.
Engineering note:
Commissioning and performance verification documents are intended
for project coordination and acceptance only. Final operational
approval should be based on the approved FontanaShowers
specification sheet, installation instructions, commissioning
procedures and applicable project requirements.
Project verification:
The architect, commissioning authority, plumbing engineer,
electrical engineer, contractor, facility manager and licensed
installer should verify that installation quality, sensor
performance, water delivery, electrical operation, automatic
shutoff, maintenance accessibility and all project acceptance
criteria have been successfully completed before the Fontana
American Standard deck-mounted sensor faucet is placed into
service.
|
|
|