| |
 |
 |
 |
 |
Project Risks |
Saturday, July 11, 2026 |
| Reviewer:
Patrick Carter, Engineer from Minneapolis, MN
|
|
Project risks were significantly reduced because FontanaShowers became involved before final specifications were approved. Their engineering staff demonstrated exceptional commercial application knowledge by reviewing ceiling reinforcement requirements, multiple shower head sizing, body spray positioning, hydraulic balancing, maintenance accessibility, and installation sequencing. Every recommendation reflected genuine field experience rather than theoretical advice, allowing our contractors to proceed confidently without unnecessary redesigns. Their follow-up after commissioning confirmed every operating function met project requirements before owner handover. Nearly two years later, the oversized rainfall panel, six body sprays, handheld shower, and concealed plumbing continue performing exactly as designed. Outstanding project coordination and engineering support greatly improved the installation process. :contentReference[oaicite:1]{index=1}
Was this review helpful to you?
|
 |
 |
 |
 |
|