Home > Installation Instructions For Fontana Brushed Gold Napoli Wall Mount Rainfall Shower Set

Fontana Brushed Gold Napoli Wall Mount Rainfall Shower Set

This brushed gold beautiful elegant design comes with solid construction for long durability that will upgrade your bathroom with a modern and cool look. Dual Holder Dual Control style for easy flow and temperature management. You'll be able to switch the knob to open rainfall showerhead or hand-held shower head as you prefer. You may even have more time to enjoy your shower with a rainfall feeling. Pressure balance valve's cartridge monitor water pressure balance to guard you against scald because of sudden changes of pressure of hot or cold water. This shower set can be easily put in without the need for professional skills.

Fontana Brushed Gold Napoli Wall Mount Rainfall Shower Set eatures:

  • Brand Name: FontanaShowers
  • Model Number: FS9614
  • Valve Core Material: Ceramic
  • Style: Contemporary
  • Type: Fixed Rotatable Type
  • Number of Handles: Dual Handle
  • Feature: Cold and Hot
  • Material: Brass
  • Surface Finish: Brushed Gold
  • Sizes: 10 and 12 inches
  • Number of Handles: Dual Handle
  • Control Type: Dual Holder Dual Control
  • Hot & Cold: Yes
  • Feature: Rainfall Shower
  • Installation Type: Wall Mount
  • Fontana Brushed Gold Napoli Wall Mount Rainfall Shower Set
    FontanaShowers® Product Warranty Information FontanaShowers Product Warranty


    Shower-Head Installation




    Hand-Held Shower Instructions

    5. HOLE LOCATIONS FOR WALL MOUNT

    Remove Front Cover (5A) from Wall Mount (5B). Use Wall Mount Screw Holes (5C) to place the desired location. Using a punch or awl, tap the screw hole locations. Holes must be vertically aligned.

    6. ANCHOR INSTALLATION

    Drill two 1/4” dia. Holes (6A). If installing into a studs drill two 1/8” dia. holes and do not use Anchors (6B). Insert Anchors (6B) into Holes (6A) and tap flush with wall.

    7. WALL MOUNT INSTALLATION

    Place Wall Mount (7A) into wall and inset Mounting Screws (7B) through Wall Mount Holes (7C) and tighten until Wall Mount (7A) is flush with the wall. Do Not Over Tighten! Insert Front Cover (7D) into Wall Mount (7A)

    8. DROP ELBOW & HOSE INSTALLATION

    Apply PTFE plumbers tape on both ends of Pipe Nipple (8A) (not included). Screw Pipe Nipple (8A) into the elbow inside the wall. The Pipe Nipple (8A) is to project 1/4” – 3/4” from the finished wall. Screw Drop Elbow (8B) onto Pipe Nipple (8A) and tighten until Drop Elbow (8B) is property positioned and flush to the finished wall.

    Place Rubber Seal (8C) inside Hex Hose Fitting (8D). Connect Hex Hose Fitting (8D) into Drop Elbow Outlet (8E) by turning Hex Hose Fitting (8D).

    9. UNIT STARTUP

    Turn on hot and cold water supplies, and check all connections for leaks.

    10. FINAL FLUSHING

    For final flushing, turn the valve on and allow water to run through the Hose (10A) for several minutes. Allow water to run for several minutes until all foreign matter clears the line.


    11. SHOWER ARM INSTALLATION
    Place Rubber Seal (11A) inside Tapered Hose Fitting (11B). Conned Hand Shower (11C) to Hose (11D) by turning Tapered Hose Fitting (118) clockwise.

















    1. Basic-size, according to the embedded box to open the hole on solid wall, should consider installing the metope of the distance between 60-75mm, for example, after blank wall in the shop, the ceramic tile surface to increase the thickness of the 20 mm, so PiQiang in the depth of the hole should be chosen 40 to 55 mm.
    2. Hole bottom should remain flat so that subsequent adjustment embedded box of vertical and horizontal convenient installation for the principle
    3. Pay attention to the direction of the up and down or so embedded box, on the left by hot water pipes, right after the cold water pipes, pick up and down the mixed water pipes.
    4. After the pipe connection, according to the pipeline arrangement, and open the corresponding channel slot tube in the blank wall.
    5. Embedded box fixed before, to embed box and trial test and pipe water clean connection pipe, and test before mixing water channels should be open.
    6. Test, before opening the switch valve core, open the water to test around inlet pipe, is connected closely with no leakage and the water pipe test after dosing open state, whether to test on the mixed water pipe connection without leakage. At the same time clean tube foreign bodies in case of influencing water control valve function.
    7. It will be embedded in a box into the solid wall with a self-tapping screw that is fixed on the wall.
    8. With parallel ruler for correction of the embedded box of horizontal and vertical direction to embed box into a level with the ground, and metope as 90°. In the absence of good correction will influence the control panel installation effect.




    Once again confirm the pipe connection is correct, try no leakage, water shower other embedded with the packing box and pipe joint is fixed
    Solid wall embedded box is installed, laid our behind the wall can be a follow-up control valve installation

    The lying of the wall not to embed box is open, lest the box into the packing after solidification effect of control valve installation
    Control valve set surface for plating and smooth surface should be kept inside the original packaging before installation to prevent scratches, corrosion, and lost.




    1. Laid metope ceramic tile or other adornment metope, keep the metope smooth, with the embedded box into 90″ vertically

    2. Along with the embedded highlights, the glass on the edge glue, embedded box to improve waterproof performance prolongs service life.



    3. Cut oof using a cutting tool embedded box of highlightings, keep away from the wall 2-4mm highly advisable.

    4. Try yo remove embedded lifted the lid plate and water components



    5. Installed control panel, check on panel hole protecting glue before set cut, such as unprotected glue set directly into the panel is easy to scratch panel
    6. Install the switch handle, with packing with small hexagonal wrench clockwise to switch handle is fixed on a main valve spool control valve in, install decorative rubber plugs.









    The installations & illustrations for Fontana Brushed Gold Napoli Wall Mount Rainfall Shower Set are for informational purposes only.