How to install Fontana Mendoza Intelligent Chrome Shower Set With Digital Display | FS121EMC
Installation Instructions for Digital Bathroom Shower Set
- Before you begin, please read the installation instructions below. Observe all local building and safety codes.
- Unpack and inspect the product for any shipping damages. If you find damages, do not install.
- Please note all showers must be installed by a professional and certified plumber otherwise warranty might be voided.
|
shower
|

|
|
|
|
Fontana Mendoza Digital Shower Installation
Coordinate the Intelligent Shower System
Explore related guidance for the digital display, concealed controls, shower outlets, wall rough-in and system commissioning.
Installation Hub
Digital Controls
Showerhead
Other Outlets
Commissioning
Project Resources
Mendoza Shower Installation Questions
What requires early coordination?Coordinate the digital display, concealed control equipment, water supplies, outlet routing and service access before closing the wall.
Open Mendoza Guide
Should control equipment remain accessible?Yes. Preserve the access required by the product instructions for serviceable controls, connections and power components.
View Project Guidance
When should the display be commissioned?Commission it after flushing and pressure testing. Verify display response, temperature indication and every approved shower function.
Review Commissioning
Where are related installation guides?The main installation hub connects the Mendoza page with mixer, showerhead, outlet and rough-in guidance.
Open Installation Hub

|
|
|