Home > Shower Mixer Installations

Shower Mixer Installations

Thermostatic Mixer Installation Instructions



Mixer Installation Instructions
Parts:

1. Rough-In Body x1
2. Anchor x4
3. Positioning Bar x2
4. Tapping Screw 1 x4
5. Tapping Screw 2 x4
6. Plate x1
7. Cover x3
8. Button x3
9. Screw 1 x3
10.Diverter Handle x1
11. Temperature Handle x1
12. Volume Handle x1
Shower
Mixer
Step 1: Step 2:
Shower
Mixer





Step 3: Step 4:
Attach the positioning bar to the rough-in body (4,5) with tapping screws. Mark the location of the mounting holes.
Remove the rough-in body and drill pilot holes at the locations marked in the previous step. Insert anchors.


Step 5: Step 6:
Attach the rough-in body to the wall.

Connect the rough-in body to the water supply pipes according to the diagram.


Step 7: Step 8:
Finish the wall surrounding the shower with a thickness of 1/2"-1-1/2".
a) Finished wall surface should not exceed the upper edge of the installation box.
If the tile exceeds the edges of the installation box, trim the tile as necessary to install the trim plate.
b) Trim the tile around the installation box as necessary.




Step 9: