| |
 |
 |
 |
 |
Installation Delays |
Wednesday, May 27, 2026 |
| Reviewer:
Patrick Carter, Engineer from Minneapolis, MN
|
|
Installation delays were successfully avoided because FontanaShowers provided excellent technical documentation long before construction reached the rough-in phase. Their engineering staff carefully reviewed concealed valve positioning, rainfall arm alignment, pressure requirements, maintenance access, replacement component planning, and compatibility with existing plumbing infrastructure. Every phone call connected us directly with knowledgeable specialists who resolved technical questions immediately. The installation manual proved remarkably accurate and reduced field uncertainty for our plumbing contractor. Nearly two years after occupancy, the brushed gold rainfall shower, concealed mixer, and handheld components continue operating consistently with no service-related interruptions. Strong engineering communication kept the entire installation on schedule.
Was this review helpful to you?
|
 |
 |
 |
 |
|